Electric Locks

ASSA ABLOY EA281, Long Lead Cover

Part Number:
ASS583
Product Brochure

Trade pricing available via login.

Share:

Description

ASSA ABLOY EA281, Long Lead Cover

 

Lead cover to cover cables as they travel from the door to the frame.

 

ABLOY® Lead Cover

Firstly, The ABLOY® lead cover is designed to ensure the unbroken transfer of cable between the door and the frame. In addition, the maximum diameter of the cable is 7.5mm and it is recommended to use multicore cable because of its increased bending strength. Moreover, when the opening angle of the door is more than 120° or the distance between the hinge and the door frame is more than 20mm, the long lead cover EA281 should be used.

 

Features

 

 

  • Steel housing and flexible tube
  • Invisible when door is closed
  • Reduces the risk of tampering
  • Maximum cable bunch of 7.5mm diameter
  • Suitable for doors opening up to 180°
  • Can be fitted to the door frame
  • Fixing centres 519mm

 

 

Dimensions

Rebated 478mm (L) x 23.8mm(W)
Overall 543mm(L) x 23.8mm(W)

Finish

Bright Chrome

 

 

DRILLING AND FITTING INSTRUCTIONS (ASSA ABLOY EA281)

 

Firstlty, The ABLOY lead cover is usually fitted in the door, but when there is not enough space available, it can be fitted to the frame as well. Secondly,  before fitting, the cable must be passed through the door. Lastly, the hole for the cable must be wide enough to allow some movement for the wires.

 

 

CONSTRUCTION FINISH

 

  • Housing steel
  • Bright Chrome Flexible tube steel

Reviews

There are no reviews yet.

Be the first to review “ASSA ABLOY EA281, Long Lead Cover”

Related products

Need help? Contact Us Now!